ABOUT VIEWWOOD HOME
Thoughtful cabinetry. Made for everyday living.
VIEWWOOD HOME specialises in whole-home cabinetry, kitchens and wardrobes. As a manufacturer, we work with homeowners on dimensions, materials and layouts, discussing the project from design through installation.
Wuhan manufacturing · International service
湖北省武汉市黄陂区罗汉寺街工业园特2号附1号1号厂房3-1
Company: 北京超漫威科技有限公司
Serving homeowners throughout Malaysia, Singapore, Australia and the United States.
SERVICE FLOW
Your project, step by step.
11 steps, with clear service stages and payment milestones.
- 01
Consultation
Discuss your location, floor plan, cabinetry needs and budget to shape the initial brief.
- 02
Deposit
Pay a 10% deposit to begin measurement and design.
- 03
Measurement
Arrange site measurements and check dimensions, appliance positions and installation conditions.
- 04
Design Proposal
Develop layouts, materials, hardware and design proposals around your routines and budget.
- 05
Confirmation
Review and confirm drawings, dimensions, materials and product specifications together.
- 06
Contract
Sign the contract covering specifications, costs, delivery and after-sales terms. Pay 60% when placing the production order.
- 07
Production
Manufacture to the approved drawings and specifications, followed by inspection and packaging.
- 08
Final Payment
Pay the remaining 30% before shipment and coordinate transport and arrival arrangements.
- 09
Installation
Install and adjust cabinetry and fittings on site according to the project arrangements.
- 10
Handover
Review the delivered work and discuss use, cleaning and routine care.
- 11
After-sales Service
Continue after-sales support and address maintenance and care needs under the agreed terms.
10% deposit → 60% production order payment → 30% balance before shipment
Read payment details ↗When should I choose a custom cabinetry supplier?
Begin discussing cabinetry during electrical and plumbing planning or installation. Checking cabinet and appliance dimensions early helps coordinate sockets, water connections and the construction sequence.
This helps reduce clashes, repeated changes and rework while bringing storage and room layouts into the same plan.
How long does a whole-home cabinetry project take?
For initial planning, allow around five months from first coordination to completion for a typical project. Actual timing depends on design development, site readiness, finishes, shipping and installation workload.
Production, sea freight and installation schedules are confirmed for your project, with delivery dates agreed during planning and in the contract.
What are the payment terms?
10% deposit to initiate measurement and design.
60% when placing the production order.
30% balance before shipment. Payment milestones and project terms are recorded in the contract.
Do you handle measurement and installation, and how are they charged?
We provide measurement and installation at local labour rates without adding profit to that part of the service, with on-site follow-up by our project supervisor and designer.
When you use our measurement and installation service, we take responsibility for damage or scratches arising during that work. The service scope and site arrangements are agreed for your project.
